What's left?

There is a lot that still needs to be done over the next 2-3 weeks. Here is what we have left with the contractors:

• Installation of granite counters
• installation of remaining base cabinet and wall cabinets that are down. 
• Add gas shut off behind stove so it is not only in basement
• Install lights over dining table area and island/peninsula
• Replace outlets around sink
• Re-glaze tub and sink in hall bathroom
• Refinish all hardwoods
• Install tile in master bath (floor and shower)
• Install master bathroom vanity and sinks
• Install master bathroom lights
• Install master toilet
• Put up drywall for basement wall & door
• Radon fix
• A/C condensation fix (the drain hose isn't the right size and it leaks water everywhere!)
• Remaining two basement cracks fixed (this is schedule for Monday)
• Porch railing installation
• Install closet shelves
• Reinstall all doors that have been removed 

I think that is everything but probably not. Hopefully this all comes together! 

Oh and Greg and I have been staining the base cabinets. Here are a couple pictures: